Progress on two projects today, one of them DATV. Using a new Octagon OSL SO I opened the case (tabbed, two down each side) and then carefully filed off the two die-cast tabs just behind the horn. Then I hacksawed off the concentric horn unit and cleaned up the edge.
This is a very loose fit in a 22mm compression coupler, in fact it passes through the stop-ring in the centre of the coupling. This is helpful as its not a bad fit in there. To make the 22mm olive grip the LNB it needed sectioning and about 4-5 mm removing equally (2.5 each) from the two halves. With some careful assembly the whole assembly can then be tightened up and securely grips the LNB outer body.
Pictures show the outcome.

- 2019-02-11 17.00.51.jpg (89.96 KiB) Viewed 6538 times

- 2019-02-11 17.02.28.jpg (66.4 KiB) Viewed 6538 times
Waiting for the 'Rocket' LNB nose-cone to finally size the copper pipe length, in the meantime making up an adaptor ring from HEX central nut to 40mm OD for fitting it all into the LNB holder.
Gas torch at the ready for the soldering job, just a bit beyond my 50 watt Weller

Gareth