WB transponder engineering tests
Posted: Wed Mar 27, 2019 5:24 pm
From AMSAT-DL:
In order to check the AMSAT Antenna performance, Es'hailSat RF Engineering Team will use WB Transponder during the next days for an hour with a constant wave carrier (CW) to perform the steps below.
o Switch OFF DATV-Beacon!
o Raise CW Carrier
o Perform level and saturation check
o Switch OFF CW Carrier
o Bring back Modulated carrier
Please refrain from any transmission during the above tests on the WB transponder - Thank you!
Once the WB DATV-Beacon is back on, you are welcome to use the WB transponder.
In order to check the AMSAT Antenna performance, Es'hailSat RF Engineering Team will use WB Transponder during the next days for an hour with a constant wave carrier (CW) to perform the steps below.
o Switch OFF DATV-Beacon!
o Raise CW Carrier
o Perform level and saturation check
o Switch OFF CW Carrier
o Bring back Modulated carrier
Please refrain from any transmission during the above tests on the WB transponder - Thank you!
Once the WB DATV-Beacon is back on, you are welcome to use the WB transponder.